NOV Baylor Elmagco
P/N 31591 with standard shaft.
Refurbished
Documentation: Workshop report with detailed scope of reconditioning and measurements.
Note: Lead time for a reconditioned may vary from time to time, but is normally 12 weeks.
Picture below provided as "illustration of workmanship".
Left picture show previous delivery packed on heavy duty wooden pallet for air freight.